depts
phones
e-mail

calendar

attractions

news releases

links

new

welcome!

Home

  

PowerPoint Presentation

Decoration Bullet   

CSO Long Term

Decoration Bullet  

CSO Information

  

Home

Decoration Bullet   

Home

Decoration Bullet  

About Us

Decoration Bullet   

Driving  Directions

Decoration Bullet

Traffic Alerts

 

Decoration Bullet Advertise & Bid Dates
Decoration Bullet Project Information

Decoration Bullet

Bid Tabs

Decoration Bullet

EEO Forms

Decoration Bullet

Wage Rates

Decoration Bullet

Supplemental Bidding Information

Decoration Bullet

Consultant Services

Decoration Bullet

Assessment Rates

Decoration Bullet CAD Standards

Decoration Bullet

Legal Notices

Decoration Bullet

Notice of Commence

Decoration Bullet  

2008 Spec Book

Decoration Bullet

Standard Drawings

Decoration Bullet Annual Reports
Decoration Bullet References

 

Decoration Bullet

ARC eBlueprint

Decoration Bullet

Buckeye Traffic

Decoration Bullet

Adobe Reader

Developer Assistance and Coordination
The Environmental Division is responsible for establishing initial contact with developers and their engineers to define project scope and developer/City responsibilities.  The Environmental Division is the primary contact with the developers through the plan development stage and coordinates plan reviews and other activities with appropriate City divisions.

Private Development Plan Review
The Environmental Division is responsible for reviewing private sewer, site and storm water management plans submitted through the City's Plans and Permits Center, including coordination with other Bureau of Engineering divisions as required.  The Environmental Division reviewed 170 site and storm water management plans in 1997.

Storm Water Management
The Environmental Division is responsible for coordinating the study, design and implementation of  a City storm water management system.  The Environmental Division is also responsible for coordinating the storm sewer system permit application process to the Ohio EPA

Sanitary Sewer Evaluation Studies
The Environmental Division is responsible for developing the scope of services and background information for the annual Sanitary Sewer Reconstruction Program.  The Environmental Division is also responsible for evaluating information from sanitary sewer flow monitors and rain gauges to develop criteria for relieving sanitary sewer system deficiencies.

Storm Water Problems
The Environmental Division provides assistance to the public and other City divisions in investigating and resolving storm water problems and complaints.

Water Pollution Control Station
The Environmental Division is responsible for preparing the scope of services for all major WPCS projects, including projects at  the Sludge Composting Facility.  The Environmental Division is responsible for performing the project management duties during the planning and design of major WPCS projects, including consultant contract administration.

Joint Economic Development Districts (JEDD)
The Environmental Division is responsible for preparing the scope of services and performing project management duties, including consultant contract administration, during the planning and design of water and sewer extension projects required under the JEDD contracts with Copley, Coventry and Springfield Townships.

 


Developed by the City of Akron, Engineering Bureau
Last Updated 11/15/11